I finished the filtered air box (FAB) and all the connections. This shows the cable connections for carb heat.
Here's a bottom view showing the alternate air door. This should be the last major firewall forward or engine related work. I'll still need to go over everything to make sure it's secured and torqued and safety wired as needed.
Sunday, January 11, 2015
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Comments?