Thursday, June 10, 2010

Tanks Almost Ready for Proseal

The fuel tanks are almost ready for proseal. I've gotten all the ribs and stiffeners and baffles for both tanks done and I've match drilled everything. The skins are countersunk for the baffles. I've finished the tank attach brackets and only need to open the ends for the fuel attach hardware and then deburr and dimple and then on to the black goop from hell. I still get a kick out of the the fact that the tank sealant (proseal) has no known solvent on the planet. Nothing melts this stuff...which is good considering it helps hold the fuel that keeps you aloft!

In the left side of the picture below, you can see the tank attach brackets that were fabricated out of a big hunk of aluminum angle. Both are shown but only the left one that's nested into the the nose flanges goes with this rib. I just had them together showing Paula how fun it is to fabricate stuff. She was thrilled.


Here are the two tanks in their cradles. I'm building both tanks and wings at the same time so clecos are at a premium which is why the left one has no clothes tomatoes clecos. I ordered more from Vans when I ordered the proseal but I accidentally ordered 3/16's and not 3/32's. I returned them and I'm waiting to receive the correct size. I also planned a swap sale at our next EAA 958 meeting and put out the word that I'm looking for more (good) clecos. I will send a crisp one dollar bill to the first person to contact me and mention this post.

Sunday, May 30, 2010

Fluting Tank Ribs

I finally finished deburring the tank ribs and now it's time to bend the flanges to 90° and flute them so they will be straight and lay flat against the inside of the tank skins. Here's the stack of ribs (14) and the shop made flange straightener.

Monday, May 24, 2010

Flight Instructor Ratings CFI, CFII, MEI

Today, I got my Flight Instructor Ratings. Below is a cropped copy of my temporary certificate. The hard copy will come in the mail in a couple of weeks. Having past military flight instructor experience allowed me to get three instructor ratings, CFI, CFII (Instrument) and MEI (Multi-Engine) with a test and a records review. The FAA designated examiner was really nice and said he was happy that he could do something for those that served in the military. My Dad went with me and we had a nice dinner at Jason's Deli before meeting the examiner.

I'm not sure if I'll use the ratings but I couldn't pass up the chance to get them for a nominal cost. It's a brand new program that sounds too good to be true which means the FAA will probably be quick to cancel it. They are not cheap to get normally. The cost for all three ratings can easily run to five figures. I could use them to give instruction to family or even for a little part time weekend income. Anywho, I've got them now and I'll decide later what to do with them.


Sunday, May 23, 2010

On to the Fuel Tanks

Time to get started on the fuel tanks. The fuel tanks are the inboard leading edges of the wing, just really beafed-up and sealed with all the appropriate lines and vents. Here, I'm test fitting the tank skin to the baffle and the adjacent wing skins. The round hole in the skin is where the fuel cap will go.

Monday, May 17, 2010

RV-12 Field Trip

Here are a few pictures of EAA Chapter 958 at Chuck Woods' hanger looking at his RV-12 progress. He also has a beautiful RV-9A painted in stars and stripes.



Carol and Norm looking at the RV-12 with Chuck's RV-9A in the background. Now that's a good looking paint job! Norm, you've got an RV-7A, an RV-9A and you're building an RV-10. Are you considering an RV-12 now too?


Don and Ed deep in conversation. If you want to hear some really good flying stories and just have an enjoyable conversation, sit with Don and talk about the Waco.

Sunday, May 16, 2010

Built Stall Warning

Since I still had Austin home, we built the stall warning assembly. Installation will come while the leading edge ribs are being installed. Was a nice change of pace doing some small intricate work.

Saturday, May 15, 2010

Finished Leading Edges and Tank Attach Strips

Wow, Austin and I got a lot of work done today. He finished his last final on Thursday and came home Friday night. Officially a senior in college with a 3.85 GPA in the business school at the University of Texas. Proud Dad! After my EAA 958 meeting this morning, we put in a solid six hours finishing the leading edges including the fuel tank attach strips. Austin was a huge help coming up with innovative ideas to help get it done. It helps that he has good hand-eye coordination and attention to detail so I don't have to watch him drill every hole. Below, he's match drilling an aft leading edge rib flange to the main spar web on the left wing. Got that? There will be a test later.

Crimper & Stripper

Here's my new (used) AMP 59250 Crimper and my new (used) Stripmaster wire stripper. I'm having to get up to speed on electrical as I have to wire the stall warning to finish the leading edge. The crimper is the tool to use for crimping as recommended by 'lectric Bob Nuckolls, author of The AeroElectric Connection. Time to get electroeducated!







Tuesday, May 11, 2010

Match Drilling and Leading Edges

Finished with match drilling the right wing. I assembled the leading edge and attached it as well. The wing is surprisingly wide (or tall since it's on edge). It will be even bigger with the ailerons and flaps installed.

Monday, May 3, 2010

More Wing Skins Clecoed

This weekend, I got a lot of airplane work done. On the left wing I finished riveting together the rib and spar skeleton while leveling it. I also clecoed (temporarily fastened) six of the eight wing skins. I installed so many clecos that I got a blister on my hand. I just need to cut and match drill the wing walk doublers before putting up the other two skins. Since the airplane, including the wings, are constructed using the semi-monocoque technique, the skins make the wing box really rigid.

Shelby was home for a short while this weekend. She was picking up her cat, Hadley (named after Ernest Hemingway's first wife who loved cats), so I got her to help hold some wing skins until I got them started. She also placed some of the rivets in the tight spots where my big hands get in the way. Thanks, Shelbs!

Tuesday, April 27, 2010

First Skin on Wing

I got the first skin put on top of the right wing. Yeah! Looks a little like an airplane part. It looks small now because there's no leading edge or flaps or ailerons yet. See the wood brace under the middle of the wing? The middle of the wing has to be supported while you're attaching the wing skins otherwise it sags a little. I made adjustable poles when I was tiling the ceiling of the shower and I get to keep using them for different projects. It's a two piece pole with a tee nut and hole in one end and a hanger bolt in the other. The top is padded and to use it, you just turn one section to raise or lower it. Paula said I should patent them. I suspect they're a little too simple to patent but I appreciate the compliment!

Here's a picture of a P-51 Mustang wing being restored. I thought the similarity was interesting.

Sunday, April 25, 2010

Riveting Main Wing Ribs to Spars

Although I haven't posted in a while, I have been making good progress. Here are some pictures of the right wing with the main ribs riveted to the main and rear spar. I've finished the left wing main ribs and only need to prime them.

This is looking through the lightening holes.


Rear spar as attached to a main rib.


Top of the main spar with the rivets holding the main ribs below. I shot the rivets old school - rivet gun with bucking bar. I like doing it that way. Definitely takes more care and practice but rewarding. Like making consistent 3' putts.

Monday, March 29, 2010

Flight Instructor Ratings

I took my flight instructor test this morning and passed with a 97! It was the military competence instructor exam which allows me to use my military flight instructor experience to get my CFI, CFII (instrument) and MEI (mulit-engine) civilian instructor ratings. All I need to do now is take my paperwork to the FSDO (Flight Standards District Office) and apply. Not sure if I'll use the ratings but nice to have.

Saturday, March 27, 2010

Real Purpose of Lightning Holes

I think I found the real purpose of lightning holes. Gotta' love those old Wurstfest beer pitchers used as cleco buckets. Perfect fit.

More Ribs Starting to Look Like a Wing

Got some more ribs done this morning. I had enough hung on the left wing to attach the rear spar. Looks vaguely like an airplane part.

Monday, March 22, 2010

Still Working on Ribs

Man-o-man, there are a lot of ribs. I have an assembly line set up but it takes a long time to deburr all the little nooks and crannies.


I have been putting the ribs on the wing spars when I finish deburring and straightening them although I'll have to take them back down before final assembly. Seeing them hanging makes it look like I'm making a little progress and motivates me to deburr some more.

Saturday, March 6, 2010

Time to Start the Ribs

No, I'm not barbecuing. The ribs are the internal bracing that go between the spars. There are a lot of them in the wings and they all have to be deburred and straightened. That's going to take me a while!

Finished the Rear Spars - For Now

Finished up the rear spars. Several other parts attach to the rear spars so I haven't seen the last of them but I've done all I can do for now. I sure like having a pneumatic squeezer for the bigger rivets like on the reinforcing plates below (painted grey). Big rivets are hard to accurately squeeze by hand. Almost feels like cheating...but I'm not giving it up.

Friday, March 5, 2010

Nifty New Seat

Here's a new addition to the Aircraft Factory (garage) I got for my birthday from my Mother and Father-in-Law, Dean and Jerry. Since I'm building the wings, there will be a lot of work that can be easier accessed from sitting height. The stool is on rollers so I'll be able to scoot around. I'm using it here to finish riveting the rear spar. Thank you for the present. It was the only airplane related one I got.

Sunday, February 28, 2010

Working on the Rear Spar

Starting the rear spar. Not real difficult so far, just a lot of deburring. Deburring keeps scratches from growing into cracks due to vibration. It is convenient having two of the standard sized (5'x2') EAA 1000 work tables on wheels and bolted end-to-end as the spars are about 9' long. I built the standard tables but customized them with locking wheels, an inset back-rivet plate, two drawers, an electric plug strip, and long bolts that allow them to be bolted side-by-side or end-to-end.

Saturday, February 27, 2010

Finished with Tie Downs

Here are the finished tie downs. Picture the threaded ring hanging down under the wing. That's where the rope or chain will attach. I had to tap (thread) the inside of the block where the ring screws. Austin and I have a lot of experience using the tap and dies from working on the Dart. It was much easier working with aluminum which gives me pause about the strength but there are over 6500 RV's flying and I've never heard about people having problems.

Speaking of RV's flying, I read yesterday that an organization that covers certified aircraft reported that 965 CERTIFIED piston aircraft were sold in 2009. Contrast that with 1032 EXPERIMENTAL piston aircraft that were given airworthiness certificates in 2009 in the U.S. alone. Of those 1032, well over half were RV's!

The tie down assembly also doubles as the attach point for the aileron pushrod brackets as seen below.

Tuesday, February 23, 2010

Working on Tie Downs

Tie downs are the metal rings that hang down under the wings where you attach ropes or chains to hold the aircraft firmly on the ground when it's parked. Small airplanes are surprisingly light. An average completed RV weighs around 1000 lbs. That's not much when you consider they have a wing span of 25 ft. A strong gust of wind can tip over most small airplanes if they're not tied down. The two large rectangles of metal get bolted to the main wing spar and the rings are screwed into the bottom. You can see how it works on the plans in the upper right corner of the photo below. These can also be used as jack points for lifting the airplane.

The shiny rectangles of aluminum with the holes in them (bottom right in picture) are spacers that go behind the tie down brackets against the spar. I fabricated them from scratch and put lightening holes in them. Lightening holes are just a way to make things lighter without affecting the strength of the item. I like to tease the gullible that lightning (without the "e") holes let the lightning out if you're struck by it.

Wednesday, February 17, 2010

Countersinks and Plate Nuts in Spar Flange

This is a wing spar with the attach points on the flange for the fuel tank. The fuel tank skin will be dimpled to fit into the shiny countersunk holes with screws holding to the plate nuts behind the holes. This is one of those steps that everyone worries about and tries to improve on Van's technique. I have to admit I was nervous drilling into that beautiful gold anodized spar. I followed Van's instructions exactly and they came out near perfect. I used the micrometer that Peggy and Stephen gave me to measure the outside diameter of the holes with the target being .365-.375 and they were .370! The more I build, the more I realize that Van's instructions work great and that I'll need a compelling reason to deviate from them.

This is a plate nut that's behind one of the countersunk holes you see in the picture above. A plate nut is simply a nut for screws or bolts that can be permanently attached to the underlying surface. This one has two wings on either side of the threaded nut with holes in them that are riveted to the flange. There are quite a few different flavors of plate nuts like ones with one long wing with both rivet holes on the same side or 90 degree corner ones but this is the most common style.

Monday, February 15, 2010

Wing Plans

Time to start diving into the wing plans. Here's one of the pages from the wings. Definitely more stuff but I haven't seen any new skills required. Just lots of drilling, deburring, dimpling and riveting.

Sunday, February 14, 2010

Wing Inventory Complete

Shelby helped me finish the wing inventory and also helped me find a place for all the parts. None of the big pieces were missing or damaged in any way. Good job packing, Van's! There were a few rivets and bolts missing (out of thousands) but nothing serious. I called Van's about a bag of wrong size rivets and they said to call when I finished inventory and they would replace them and anything else missing at no charge.

Here's how we used the long skinny (16') box. I mounted storage brackes to the ceiling and Sheby and I just put the box sitting sideways on the brackets. Simple and provides plenty of storage for long items like the longerons (used in the fuselage) and it's up high and out of the way but easily accessible. It's a challenge building in a two car garage while keeping room open for Paula's car.

Saturday, February 13, 2010

Paula Helps Inventory the Wings

We dove into inventorying the wing kit and made it through the long skinny box. It's not a great picture but here's Paula checking off items for me as I dig them out of the box.

Friday, February 12, 2010

Sorting Hardware

Wow, there are a lot of little parts that go into the wings. I spent about 5 or 6 hours inventorying and sorting all the rivets and bolts and bits into drawers. It was a lot of work but it will make it much easier to find what I need when I need it.

Tuesday, February 2, 2010

Wings Delivered

The wings are here! FedEx Freight did a great job. They arrived 10 minutes before their scheduled delivery time and the crates were in perfect condition. I had my camera ready to photograph any damage but there wasn't any. The boxes were even oriented with the arrows up. I've read about crates being delivered by other freight companies that were half destroyed. My neighbor, Tim, was nice enough to help me unload them. I was a little disappointed that he didn't accept my offer of a Shiner Bock. Here they are between the stands I'll mount and build them on. I have 30 days to inventory and report any discrepancies to Van's. I will certainly have plenty to keep me busy for quite a while. As my Dad said, "that will sure keep you off the streets".

Wednesday, December 30, 2009

Finishing Wing Stands with a Little Help

I got a little help finishing my wing stands. Nephew Cameron (smiling) was visiting from Houston so I put him to work drilling brackets for my Rudi Greyling of South Africa inspired wing stands. Austin had previously helped me with welding the bottom feet. I painted one set red and the other set green. For those unfamiliar with aircraft or boat lighting, red is for the left wing or port side and green for the right or starboard side. The memory aids I was taught were: "red, right, returning" - if the red light is on the right, the aircraft or ship is pointed toward you and "port wine" - port is left in boat speak and port wine is reddish. I figure the simple color coding might prevent me from reversing parts.

I only need to bolt them to the floor and I'll be ready for the wings. Location will be important as I plan on building both wings at the same time but I want to have enough room to park a car in the garage. They're scheduled to ship during the week of the 18th of January.

Monday, November 2, 2009

YEA! Wings Ordered!

I ordered my wings today! YEA!!!!! More details to follow. I'm glad I got them before the 1st of the year price increase. These aren't mine but what they'll look like soon. There is a 3 month backlog but better than never!


Saturday, August 29, 2009

Helped Norm install Wings on his RV-9A

Here's Norm's RV-9A that we just finished installing the wings. He invited me over both to help (it takes about 4 people) and to learn. It wasn't terribly hard but definitely one of those things where seeing it done was worth more than reading a 1000 pages of instructions.


Here's Norm and his wife Carol on the left and Phil the RV guru in the chair and Skip who's building an RV-6 taking pictures after installing the wings.


Norm was nice enough to give me his wing cradle after we finished. He (Carol) also fed us lunch. I think I got the best end of the deal. I've got to think of a good way to return the favor to Norm.


Wednesday, August 26, 2009

Plumbed for Air

Here, I've plumbed the aircraft factory (garage) for compressed air. It's both a convenience to have air outlets in more places and important to condition the air. Air compressors heat the air when compressing it. That causes problems because when the air cools, it condenses moisture which ends up inside tools or paint guns.

My solution to the moisture problem was to pipe the air through steel pipe which allows the air to cool and then give it a place to go before getting to the tools. I've got risers like the one pictured here that send the air up and the water down to a drain. Not real interesting but important for keeping rust out of your tools or spots out of your paint.

I promised my friend John that I'd help him with his layout for his garage so I annotated the pictures below and added an abbreviated description of what I did.









1. I used 3/4" galvanized steel piping for the perimeter and 1/2" for each drop leg. I tried to slope the pipe toward every drop to help control moisture. Water goes down, air goes up. On some of the drops, I just used a 3/4" Tee.


2. I used several unions in the perimeter piping. Unions allow you to disconnect the two pipes on either side of the union without turning either pipe to unscrew it. I was able to build the system in sections and put them up one section at a time. It really made it easier to trouble shoot leaks since I could just remove one section and work on it while leaving the rest in place.

3. The basic set-up of each drop is shown above. I used 1/2" unions on each branch-off from the drop to allow me to remove it without having to twist pipe. I used brass ball valves on the bottom of each drop as that's where the water will collect. On some of the drops, I added a male air fitting after the ball valve which allows me to add another compressor to the system. If you have a different size filter (3/8" is common), just change the reducer bushing and nipple coming out of the union to that size. On the branch above, I have an oiler in addition to the filter/regulator because this is the place I run most of my air tools. That saves me from having to remember to add oil drops to every tool before use. The other drops don't have an oiler.

4. I used Rector Seal #5 pipe thread sealant from Home Depot and teflon tape for every joint. I first wrapped the threads with teflon tape and then "painted" the Rector Seal over the teflon tape. I tried several variations and this way works best for me. I used a spray bottle with slightly soapy water to test all the joints and I don't get any leaks.

5. For my compressor hook-up, I just have a drop like shown above but instead of a filter, I have a short length of air hose that attaches to the reducer bushing on the union. By keeping all the drops standard, I can move the compressor or any fitting like the one with the oiler to any location in the garage I want by just disconnecting the union.

6. I have 5 drops in my system. I put the drop I plan on painting from on the last leg. My tool drop is the next to the last. When I bleed each drop, I get very little moisture after the first drop from the compressor which is the way it's supposed to work. There are fancier ways to do this but it works well for me. Some folks have a loop type arrangement at each drop where the pipe first goes up and then back around and down but I didn't have enough room against the wall plus it would add several additional joints for each drop.

Hope this helps, John.

Tuesday, August 11, 2009

Finished the Empennage

Well, I've finished the empennage, sort of. Just a few little details like trimming the counterweights to balance the elevators. I still have to do the fiberglass tips but most people wait to do all the fiberglass work together because of the mess. The wings are next and I've gotten the OK from my Chief Financial Officer to order them once I've gotten the Hardi siding for the house ordered.


Saturday, August 1, 2009

Finished Trim Tab

Yea! I finished the trim tab version II. This one turned out much better. I hadn't planned on this being a "how to" blog but I learned so much and the trim tab turned out so good, I thought I'd share some of what I learned. This post may be a little jumbled as it will take me more than one sitting to put everything together.

You can stop reading now if you don't want the technical stuff. Here's what I learned to make a great trim tab:

1. Use hard wood. I used oak. I first tried pine and it wouldn't make a crisp bend.
2. Use a strong clamp. I used a Bessey parallel jaw woodworking clamp.
3. Make your jig from 1 inch nominal (3/4) stock. I first tried 1 1/2 in. stock and the extra width put a crease in the skin when clamping.
4. Use a back brace. You can see it in one of the pictures below. Basically, it kept the jig from sliding when using the rivet gun on the fold.
5. Use a protective strip when softly riveting the folds. I used a very thin strip of oak but something like formica would work well, too. You can see me using the strip in the last video below.