I did have to wait for a #19 short angle threaded drill bit to drill the wear block into the baggage floor rib.
Sunday, March 11, 2012
Finished The Steps
I finished both steps. As usual, the right one took a week and the left one took less than two hours. The rivet spacing as shown on the step plans works great and allows one of the rivets along the line that overlays the inside rib to line up perfectly. I just had to drill out the rivet and all the others are well clear of the existing rivets.
I did have to wait for a #19 short angle threaded drill bit to drill the wear block into the baggage floor rib.
I did have to wait for a #19 short angle threaded drill bit to drill the wear block into the baggage floor rib.