Finished the rear canopy skirt.
Revised the pull tab.
Tuesday, December 3, 2013
Sunday, December 1, 2013
Canopy Tab Opener
Here's the canopy opener tab I fabricated to help pull the canopy open. The canopy is really snug so this helps keep the pull up and even.
Labels:
06-Fuselage
Thursday, November 21, 2013
Canopy Rear Skirt
I'm almost finished with the rear canopy skirt. I decided to go fiberglass and it's looking fine. Here's the prep work. I used heavy clear packing tape on the area to get fiberglass and outlined the final size with electrical tape. Then I waxed everything with paste wax.
Here's the final rough product. It popped off easily. I've been busy for the last couple of days sanding and filling. Overall, I was really happy with the way it turned out.
Here's the final rough product. It popped off easily. I've been busy for the last couple of days sanding and filling. Overall, I was really happy with the way it turned out.
Labels:
06-Fuselage
Monday, November 4, 2013
Installing Interior
I got a good start installing the Classic Aero interior. I'm really impressed with the fit and quality. We had a crowd home for Austin's birthday party so everyone got to sit in it. Austin said it looked like the interior of a Corvette. I'm also happy with the color of the panel and how it looks against the black panel instruments.
Here's Shelby with her Halloween cat ears watching me and Dave make airplane noises.
Here's Shelby with her Halloween cat ears watching me and Dave make airplane noises.
Labels:
06-Fuselage
Monday, October 28, 2013
Forward Top Skin
Austin came home and we attached the forward top skin. Sure was glad he was able to help as my arms aren't long enough to reach most of the rivets. He ran the rivet gun on the outside and I bucked from the inside. I painted the glareshield in a matte hot rod black before riveting and it looked really good with the gold rivets against the black. After we finished riveting, I scuffed and repainted to cover the rivets that will be exposed inside the cockpit. The rest of the rivets will get painted over with the exterior paint.
Labels:
06-Fuselage
Thursday, October 24, 2013
Canopy Frame Adjustments
I cut the front canopy frame legs just a little short. It's a common problem. To fix it, I used a bronze sleeve bearing from McMaster Carr pictured below. I had to enlarge the inside diameter just a tad so I did the poor man's machine shop method of chucking a die grinder burr bit in the drill press and wrapping it with sticky backed sandpaper and reaming out the inside. Only took about 10 minutes and then I cut it down to length. You can see where I installed it just to the left of the blue "R" and the black wheel at the top of the photo. I also ordered two quick release pins with lanyards that I might use during test flights to replace the screws to allow the canopy to come off easier. It took a while to find the right sizes so I included the invoice with part numbers in the picture in case someone else wants to do the same.
Labels:
06-Fuselage
Sunday, October 20, 2013
Finishing Slider Canopy
I'm close to finishing the slider part of the canopy under Scooter's watchful cat eye. I painted all the inside pieces to match the interior trim paint including the underside of the trim strips. This will complete the bubble part of the canopy but I'll still have the fiberglass rear skirt and the fiberglass trim around the front windscreen to go.
Here's painting in progress for all the inside parts of the canopy plus the back of the co-pilot seat.
Here's painting in progress for all the inside parts of the canopy plus the back of the co-pilot seat.
Labels:
06-Fuselage
Saturday, October 5, 2013
Fitting Canopy Side Skirts
Here's how I drilled the canopy side skirts to the inside braces. The paint stick with a shim holds the skirt in place while I reach inside with the wood backer tool to hold it against the inside of the skirt while I match drill the holes. I've finished both sides and it worked just fine.
Labels:
06-Fuselage
Lancaster Shrinker-Stretcher
Here's a new tool I got to help fit the canopy side skirts. It's a Lancaster Shrinker-Stretcher. I only needed the shrinker jaws and I special ordered them with a stippled finish which is the roughness of 180 grit sandpaper and much easier on aluminum than the serrated jaws. You put the edge of the metal you're trying to shrink in the jaws and squeeze with the handle.
It allows you to make a compound curve like the one below. It may be hard to see but the side skirt is bowed in both directions which makes it hug the fuselage nicely.
Labels:
03-Tools
Monday, September 30, 2013
Cleaning The Canopy
Here's a shot of the canopy with the protective plastic removed. I'm countersinking the attachment holes in the Plexiglas and finishing the side skirts before disassembly and painting. I polished it with some Plexus and it looks clear and shiny. There are a few small scratches I may repair but nothing of any real consequence. I still haven't decided if I want to go with a metal rear skirt or fiberglass. I ordered some more Alclad .032 2024-T3 aluminum sheet and I'll work with it this weekend. If I decide I don't like it, I can always go with fiberglass. Paula had a good suggestion to use both. Good idea! I might trim the edges with metal like the front of the canopy which will provide even support for the rivets and a good attachment point for the fiberglass.
Labels:
06-Fuselage
Tuesday, September 24, 2013
Canopy Work Continues
I have been making very good progress on the canopy. Here's the nice aftermarket outside handle for locking the canopy.
The inside handle is finished, too. Works and locks nicely.
This is one of the rear blocks on the canopy that locks it into place when it's fully forward. The pin on the left goes into a hole in the white block. The lines are there to help align the hole properly. The white stuff is UHMW plastic that's really slippery but super solid. It's used in several places on the airplane that need to reduce friction between two parts.
Here, I'm working on the canopy side skirts. I'll need some help to drill them to the inside braces but that should be all I need before disassembly in preparation for painting and final assembly. After that, I'll fiberglass the front and rear skirts.
The inside handle is finished, too. Works and locks nicely.
This is one of the rear blocks on the canopy that locks it into place when it's fully forward. The pin on the left goes into a hole in the white block. The lines are there to help align the hole properly. The white stuff is UHMW plastic that's really slippery but super solid. It's used in several places on the airplane that need to reduce friction between two parts.
Here, I'm working on the canopy side skirts. I'll need some help to drill them to the inside braces but that should be all I need before disassembly in preparation for painting and final assembly. After that, I'll fiberglass the front and rear skirts.
Labels:
06-Fuselage
Monday, September 9, 2013
Custom Canopy Trim and Windscreen
Work continues on the canopy but the end is in sight. This weekend, I made a custom trim strip for the forward edge of the slider canopy. I shamelessly copied Matt Burch. I like how it turned out and think the extra support will reduce the stress on the rivets that hold the plexi to the frame. Plus, I think it will look better.
I fretted for a week about how to cut both sides of the windscreen the same so this is what I came up with. It's thick wrapping paper that I attached at three points with clecos to use as a pattern. The marked lines show through the paper so I just flipped it over to check each side. Worked great and fast and easy and now both sides are the same.
I fretted for a week about how to cut both sides of the windscreen the same so this is what I came up with. It's thick wrapping paper that I attached at three points with clecos to use as a pattern. The marked lines show through the paper so I just flipped it over to check each side. Worked great and fast and easy and now both sides are the same.
Labels:
06-Fuselage
Tuesday, September 3, 2013
Fitting the Canopy
I've had the canopy on and off at least 20 times trying to get the fit just right. Getting close.
Lifting from the workbench.
Here's a close up of an edge of the plexiglass. Final polish was at 600 grit. Looks almost clear and you can see the drilled holes through the edge.
Lifting from the workbench.
Here's a close up of an edge of the plexiglass. Final polish was at 600 grit. Looks almost clear and you can see the drilled holes through the edge.
Labels:
06-Fuselage
Monday, August 26, 2013
Canopy Bubble Drilled To Frame
I've successfully drilled the canopy plexiglass to the frame. I will have to take it on and off several times to tweak the fit but it's nice to have it looking like an airplane.
It takes a bunch of clamps to get everything aligned.
It takes a bunch of clamps to get everything aligned.
Labels:
06-Fuselage
Monday, August 12, 2013
Canopy Big Cut
Made the canopy big cut. I didn't have any problems but it sure helped that it was 100 degrees outside and probably more in the garage.
I used my Sioux 2600 rpm drill motor with the fiber cutting disk. The drill had a lot more control than my cutoff tool. I used the frame as a support for the rear part of the canopy and blocks and tape for the forward part. It separated easily.
I used my Sioux 2600 rpm drill motor with the fiber cutting disk. The drill had a lot more control than my cutoff tool. I used the frame as a support for the rear part of the canopy and blocks and tape for the forward part. It separated easily.
Here are the two parts of the canopy on the workbench positioned so I can smooth the cuts. I've got quite a bit left to do on the canopy but it was nice to finish the "Big Cut".
Labels:
06-Fuselage
Monday, August 5, 2013
Starting On The Canopy Bubble
I marked the centerline of the canopy bubble. I'm going to double and triple check before doing any cutting but using the laser made it really easy.
I used a laser line device. Ryobi from the aviation isle of Home Depot. About $49.
The laser line didn't photograph so well but I thought it was an interesting picture.
I used a laser line device. Ryobi from the aviation isle of Home Depot. About $49.
The laser line didn't photograph so well but I thought it was an interesting picture.
Here's where I found the centerline of the canopy. I used the manufacturers marks on both ends and connected those. I tried the string method of measuring equally from both sides but the edges of the plexi are wavy and inconsistent so it was hard to find a perfect centerline.
Labels:
06-Fuselage
Finished Canopy Frame
I finished fitting the canopy frame. Time to move on to the canopy Plexiglas.
This was the method that worked the best. I used a 2'x4' piece of 3/4" MDF and traced the outline of both the roll bar and the aft turtle deck. For the aft canopy hoop, I had to cut a small square hole for the slider block bracket and position the MDF hanging over the workbench a little. The blocks are 3/4" plywood screwed in place with deck screws. It takes a fair amount of force to bend the tubing so I screwed the board to the workbench. The inside blocks are slightly curved. It only took about an hour to do the actual bending.
This didn't work so well. Every time I'd get something right, it would change the shape somewhere else.
This was the method that worked the best. I used a 2'x4' piece of 3/4" MDF and traced the outline of both the roll bar and the aft turtle deck. For the aft canopy hoop, I had to cut a small square hole for the slider block bracket and position the MDF hanging over the workbench a little. The blocks are 3/4" plywood screwed in place with deck screws. It takes a fair amount of force to bend the tubing so I screwed the board to the workbench. The inside blocks are slightly curved. It only took about an hour to do the actual bending.
This didn't work so well. Every time I'd get something right, it would change the shape somewhere else.
Labels:
06-Fuselage
Monday, July 29, 2013
Canopy Slider Frame
I've been tweaking the canopy slider frame. I'm at the point where it slides back and forth with one finger and almost every measurement is spot on except the back bow. I'll be doing a fiberglass fairing so I need to read more about how close to perfect it needs to be.
Labels:
06-Fuselage
Tuesday, July 16, 2013
Avionics Cooling Fan/Defroster
I cut the vents in the glareshield for the avionics cooling fans that double as defrosters. I did it by hand and it's not perfect but I installed the fans and tested them and they work great.
Here's one of the fans. They are 80 mm computer cooling fans. That size was the most common at Altex Computers so I knew they would be easy to replace and they only cost about $12 each. This brand was the quietest by spec and when installed and tested I could barely hear them while they put out good airflow. The design came from the guard that is installed on the bottom of the fan. I just unscrewed it and traced it onto the glareshield.
Specs on the back of the box.
Here's one of the fans. They are 80 mm computer cooling fans. That size was the most common at Altex Computers so I knew they would be easy to replace and they only cost about $12 each. This brand was the quietest by spec and when installed and tested I could barely hear them while they put out good airflow. The design came from the guard that is installed on the bottom of the fan. I just unscrewed it and traced it onto the glareshield.
Specs on the back of the box.
Labels:
09-Panel
Monday, July 15, 2013
Canopy Rollbar
I got the canopy roll bar installed. It's nice to get back to some fabrication work. The rollbar fit perfectly without any adjustment required.
The hardest part was attaching the nuts, washers and spacers under the canopy rail. I read where many had just cut away the bottom of the rail but I was looking for a better solution. I ended up fabricating an offset 7/16 socket and it worked great. I also put a dot of superglue on the washer and bolt to hold it to the spacer. It only took 5 minutes to get everything assembled with the new tool. I had unsuccessfully tried for 30 minutes and knew there had to be a better way. The hook shape of the tool arm has no purpose. That's just the way it came out of the junk bucket.
The hardest part was attaching the nuts, washers and spacers under the canopy rail. I read where many had just cut away the bottom of the rail but I was looking for a better solution. I ended up fabricating an offset 7/16 socket and it worked great. I also put a dot of superglue on the washer and bolt to hold it to the spacer. It only took 5 minutes to get everything assembled with the new tool. I had unsuccessfully tried for 30 minutes and knew there had to be a better way. The hook shape of the tool arm has no purpose. That's just the way it came out of the junk bucket.
Here's the forward roll bar brace installed. I had to remove the radio stack and the top skin to drill the forward holes.
Labels:
06-Fuselage
Friday, July 12, 2013
ELT Antenna
After much thought, I decided to mount the ELT (Emergency Locator Transmitter) antenna in the tailcone. It will be under the fiberglass empennage fairing which will allow clear transmission and protection in case of an accident.
Labels:
04-Empennage,
09-Panel
Thursday, July 11, 2013
Autopilot Connected
I connected and tested the pitch autopilot which controls altitude. Dynon and Skyview sure make it easy. After I connected the long elevator pushrod, I went through the software setup and testing and it only took five minutes. This picture isn't the greatest but it shows the autopilot (AP>) connected with LEVEL selected. Pushing the LEVEL button instantly engages the autopilot in straight and level flight. I also played with ALT which commands the autopilot to go to the altitude you have selected with the altitude bug. It was fun watching the elevator pitch up or down trying to go to different altitudes. Since I'm in the garage and it's difficult to change altitude, the autopilot went to the stops valiantly trying to command the elevator to get us to our selected altitude.
Here's the elevator pushrod temporarily installed. I have bubble wrap on it to prevent scratches when installing.
Here's the elevator pushrod temporarily installed. I have bubble wrap on it to prevent scratches when installing.
Labels:
09-Panel
Thursday, June 27, 2013
Parachute
Received my new (to me) parachute. It's a Strong 303. I'll use it during Phase 1 testing and decide if I want to keep it or pass it on to the next RV builder.
Labels:
06-Fuselage
Pitot and AOA
I finished running the SafeAir 1 pitot and angle of attack tubing in the fuselage. The kit and connectors made it really easy.
The ends of the plastic tubing have to be cut perfectly flush and without deforming it. Here's a nifty way I found to do it. The cutter can be picked up at Radio Shack or maybe Home Depot. I used it for telephone and data cable. It's only a few bucks. Just lower one of the cutters and a few spins makes a perfect cut.
The ends of the plastic tubing have to be cut perfectly flush and without deforming it. Here's a nifty way I found to do it. The cutter can be picked up at Radio Shack or maybe Home Depot. I used it for telephone and data cable. It's only a few bucks. Just lower one of the cutters and a few spins makes a perfect cut.
Labels:
06-Fuselage
Subscribe to:
Posts (Atom)






